Navigation:  Energy Management Terminology >

A - C

Previous page Next page
  rev. 2011-06-13        

- A -

Absorption Chiller

Actual Usage Profile

Adjusted Baseline Usage Profile

Adjusted Consumption

Aerator

AFUE (Annual Fuel Utilization Efficiency)

Air Barrier

Air Control Layer System

Air-Impermeable Material

Air-Permeable Material

Alternate Identifiers

Approved Opportunity

ASHRAE

- B -

Ballast

Base Year

Baseline Adjustment

Baseline Model

Baseline Period

Baseline Usage Profile

Benefit Cost Ratio

Bill Due Date

Billing Date

Billing Period

Blackwater

Blowdown

Boiler

Boiler, Packaged

BTU (British Thermal Unit)

Building Commissioning

Building Envelope (Building Enclosure)

- C -

CFM (Cubic Feet Per Minute)

Chase

Coefficient of Utilization (Lighting)

Coefficients

Colour Rendering Index (CRI)

Condenser

Conditioned Space

Conduction

Construction Documents

Convection

Cooling Balance Point

Cooling Degree Days

Cooling Tower

COP

CV(RMSE)

 

 

 

 

 

 

 

 

 

 

 

 



glos_AtoC         ©2017 Managing Energy Inc.